Electrical Department
The Electrical Inspector, John Brennan, does his inspections on Monday thru Thursday after 5:30 p.m.
There are two underground inspctions required.
1. 6 inches of stone dust/sand on the bottom of the trench, pipes placed on the stone dust/sand.
2. 10 inches of stone dust/sand on top of pipes, caution tape placed 8 inches from finish.
The whole trench must be left open for tape inspection which is the final inspection.